OTTAWA – Repairs to the Illinois 23/71 Bridge will begin on Tuesday. Work will consist of removing and replacing the bridge expansion joints, deck slab patching, and structural repair. One lane will remain open during the $2.6 million project, which is scheduled to be completed by fall. Motorists can expect delays and should allow for extra time for trips through this area and be prepared for slow and stopped traffic.
It looks like you are not a member of VIP Club yet. Please fill out the form below to access the page and join the VIP Club