IDOT begins work on Route 40 bridge

vvkltdhih5hh5kole3wwjircpu637382

The bridge will be built one half at a time and one lane of traffic will be open and controlled by temporary signals during the project, which is anticipated to be completed in summer 2027.

IDOT begins work on Route 40 bridge

vvkltdhih5hh5kole3wwjircpu603664

The bridge will be built one half at a time and one lane of traffic will be open and controlled by temporary signals during the project, which is anticipated to be completed in summer 2027.